Omni Furniture Series Stryker-Books Pdf

Omni Furniture Series Stryker
08 Jan 2020 | 60 views | 0 downloads | 22 Pages | 1,000.75 KB

Share Pdf : Omni Furniture Series Stryker

Download and Preview : Omni Furniture Series Stryker


Report CopyRight/DMCA Form For : Omni Furniture Series Stryker



Transcription

Table of Contents, Omniwallt Omnidockert Gas And Electrical Roughin Locations 2. Omniwallt Installation Instructions 3, Omniwallt Semi Private Unit Installation Instructions 4. Omnidockert Installation Instructions 5, Omniwallt Omnidockert Configuration Drawing 6. Omniwallt Electrical Schematic 7 8, Omnidockert Electrical Schematic 9 10. Omniwallt Transformer Junction Box Electrical Schematic 11. Omniwallt Wiring Diagram For Connecting Light Fixture Control Board 12. Omniwallt Light Fixture Wiring Diagram 13, Infant Omniwallt Roughin Locations 14.
Infant Omniwallt Installation Instructions 15, Infant Omniwallt Configuration Drawing 16. Infant Omniwallt Electrical Schematic 17 18, Omniwallt Light Fixture Control Troubleshooting Flow Chart 19. Door Hinge Adjustment 20, OmniWall t OmniDockertInstallation Instructions. OMNIWALLt OMNIDOCKERt GAS AND ELECTRICAL ROUGHIN LOCATIONS. GAS AND ELECTRICAL ROUGHIN LOCATIONS, Gas and electrical outlets shown for reference only. See configuration drawing s for correct configuration s. ROUGH IN CONTRACTOR TO SUPPLY THE FOLLOWING, 1 A single gang opening for each branch circuit Openings to be located in electrical drop location Omni.
Wallt connects to hospital circuit via flexible metal conduit with a single gang cover plate attached Con. tractor to supply ring collar boxes in specific circumstances for OmniWallt OmniDockert interconnect. to hospital circuit, 2 Gas lines stubbed through drywall in gas drop location. OmniWall t OmniDockertInstallation Instructions, OMNIWALLt INSTALLATION INSTRUCTIONS. 1 Locate the proposed bed center line and mark it on the wall at headwall height. 2 Measure out from the center line and mark the wall to locate one end of the hanging strip ref above. 3 Measure up from the floor and mark the wall to locate the top of the hanging strip ref above. 4 Locate and mark the wall studs minimum of four Using the pan head screws provided align and fasten. the hanging strip to the wall matching the marks made for the studs. 5 To remove the access panel and expose the electrical location and gas hookup detach the inside angled. door on the right side of the cabinet pull forward on the back of the hinge bracket remove the two. screws slide the panel to the right and lift it out. 6 Hang the OmniWallt on the hanging strip and check it for proper location. 7 Before securing the units permanently to the wall slide both units together on the hanging track to secure. the prefab spacer box between them, 8 Locate two studs behind the access panel and using the pan head screws provided install the two top. brackets on the bottom channel, 9 Refer to the wiring diagram for the internal wiring configuration Make connections to the electrical and. communication services in accordance with applicable national and local electrical codes Pull in the tele. phone and nurse call wiring Field terminations shall be made within the unit only. 10 Reinstall the center access panel and fasten it with two set screws. If installing semi private units refer to page 4 for proper dimensions. OmniWall t OmniDockertInstallation Instructions, OMNIWALLt SEMI PRIVATE UNIT INSTALLATION INSTRUCTIONS.
FRONT VIEW, OmniWall t OmniDockertInstallation Instructions. OMNIDOCKERt INSTALLATION INSTRUCTIONS, 1 Locate the proposed bed center line and mark it on the wall at docker height. 2 Measure out from the center line and mark the wall to locate one end of the hanging strip ref above. 3 Measure up from the floor and mark the wall to locate the top of the hanging strip ref above Using the. hanger end and top marks as guides mark a straight horizontal line to locate the top of the hanger. 4 Locate and mark wall studs minimum of three Using the pan head screws provided align and fasten. the hanging strip to the wall matching the marks for the studs. 5 Hang the OmniDockert on the hanging strip and check for proper location. 6 To remove the access panel remove the three screws from the bottom Using the bumper strips for pulls. tip out the bottom of the panel and slide it downward. 7 Locate the two studs behind the access panel and using the pan head screws provided install the two. top brackets on the bottom channel, 8 Refer to the wiring diagram for the internal wiring configuration Make connections to the electrical and. communication services in accordance with applicable national and local electrical codes Pull in the tele. phone and nurse call wiring Field termination shall be made within the unit only. 9 Reinstall the center access panel and fasten with the three set screws. OmniWall t OmniDockertInstallation Instructions, OMNIWALLt OMNIDOCKERt CONFIGURATION DRAWING. 44 43 42 6, 43 PURITAN BENNETT, 44 CHEMETRON, 1 NORMAL POWER RECEPTACLE 12 NURSE CALL.
2 EMERGENCY POWER RECEPTACLE 16 LOW VOLTAGE RELAY BOARD. 4 DATA TELEPHONE JACK 42 OXYGEN OUTLET, 6 LIGHT FIXTURE 43 AIR OUTLET. 7 LIGHT SWITCH 44 VACUUM OUTLET, 11 VACUUM BOTTLE HANGER 46 BLANK RECEPTACLE PLATE. 50 BED INTERFACE RECEPTACLE, Sample only Individual units will vary based on OmniWallt OmniDockert configuration. OmniWall t OmniDockertInstallation Instructions, OMNIWALLt ELECTRICAL SCHEMATIC. Sample only Individual units will vary based on OmniWallt OmniDockert configuration. OmniWall t OmniDockertInstallation Instructions, OMNIWALLt ELECTRICAL SCHEMATIC.
FIND NUMBER, 1 Normal Power Receptacle 20 Conduit Connector 3 8 Straight. 2 Emergency Power Receptacle 24 Conduit Connector 1 2 90. 6 Light Fixture 25 Conduit Connector 3 8 45, 7 Light Switch Control 26 Wire 12 AWG Black. 9 Flexible Metal Conduit 3 8 27 Wire 12 AWG White, 10 Flexible Metal Conduit 1 2 28 Wire 12 AWG Green. 12 Conduit Junction Box 4 x4 x2 1 8 29 Wire 10 AWG Green. 13 Ground Bus Bar 30 Wire 18 AWG Black, 14 Transformer Step Down 31 Wire 18 AWG White. 15 Wire Attach Crimps 32 Wire 18 AWG Green, 16 Lighting Control Relay Board Spade Terminals 33 Multi Conductor Cable 22 AWG.
17 Wire Nuts Small 35 Conduit Nipple 1 2, 18 Wire Nuts Large 36 Wire Attach Crimps Spade Terminals. 19 Wire Attach Crimps 66 Single Gang Handy Box Cover Plate 1 2 Knockout. CIRCUIT 1 Emergency Power Line Voltage, CIRCUIT 2 Normal Power Line Voltage. CIRCUIT 3 Low Voltage Applications, A Lighting control relay board. B Lighting control switch, WIRING NOTES, 1 All power supply receptacles will be wired using 12 AWG type AWM copper wire stranded Phase wire. black neutral wire white and ground wire green Wire voltage rating 300 volts Wire temperature rating. A Power lines for light fixture transformer and relay control board will be 18 AWG type AWM stranded. copper wire Wire voltage rating 300 volts Wire temperature rating 105 C Phase wires black neutral. wire white ground wire green, 2 All low voltage and communication wires will be multi conductor cable type UL 2464 Individual conductor.
wire will be 22 AWG stranded copper wire Cable voltage rating 300 volts Cable temperature rating. 80 C Colors and connections specified per application. 3 All wires will be routed through flexible metal conduit and metal junction boxes outlet boxes. A All power lines will be routed through 1 2 flexible metal conduit. B Nurse call and communication lines will be routed through 3 4 flexible metal conduit. C Low voltage switch cables will be routed through 3 8 flexible metal conduit. 4 The jumper wire connecting the emergency power circuit ground bus bar and the normal power circuit. ground bus bar will be 10 AWG type AWM copper wire green insulation Wire voltage rating 300 volts. Wire temperature rating 105 C, A All ground bus bars will be located in their respective junction boxes. 5 Equipment bonding and device bonding will be in accordance with NFPA NEC 1993. MOUNTING NOTES, Step down transformer and lighting control relay board are mounted to the inside surface of their respective. junction box covers, A protective blanket should be used to protect conduit and wires during brazing plumbing operation. OMNIDOCKERt ELECTRICAL SCHEMATIC, Sample only Individual units will vary based on OmniWallt OmniDockert configuration. OmniWall t OmniDockertInstallation Instructions, Outlet Junction Box.
For Future Applications, OmniWall t OmniDockertInstallation Instructions. OMNIDOCKERt ELECTRICAL SCHEMATIC, FIND NUMBER, 1 Normal Power Receptacle 26 Wire 12 AWG Black. 2 Emergency Power Receptacle 27 Wire 12 AWG White, 9 Flexible Metal Conduit 3 8 28 Wire 12 AWG Green. 10 Flexible Metal Conduit 1 2 29 Wire 10 AWG Green. 11 Flexible Metal Conduit 3 4 34 Telephone Data Cable 22 AWG. 12 Conduit Junction Box 4 x4 x2 1 8 35 Conduit Nipple 1 2. 13 Ground Bus Bar 50 Bed Interface Receptacle, 18 Wire Nuts Large 51 Cover Plate Sidecom Connector. 20 Conduit Connector 3 8 Straight 54 Multi Connector Cable Lighting Control. 21 Conduit Connector 1 2 Straight 55 Multi Connector Cable Nurse Call. 22 Conduit Connector 3 4 Straight 56 Multi Connector Cable Nurse Call Communication. 23 Conduit Connector 3 8 90 66 Single Gang Handy Box Cover Plate 1 2 Knockout. 24 Conduit Connector 1 2 90 67 Sin Gang Handy Box Cvr Plate 1 2 3 4 Knockouts. 25 Conduit Connector 3 8 45 71 Conduit Connector 3 4 90. CIRCUIT 1 Emergency Power Line Voltage, CIRCUIT 2 Normal Power Line Voltage.
CIRCUIT 3 Low Voltage Applications, A Telephone Data. B Bed Interface, 1 Lighting Control, 2 Nurse Call Communications. WIRING NOTES, 1 All power supply receptacles will be wired using 12 AWG type AWM copper wire stranded Phase wire. black neutral wire white and ground wire green Wire voltage rating 300 volts Wire temperature rating. 2 All low voltage communication and nurse call wires will be multi conductor cable type UL 2464 Individual. conductor wire will be 22 AWG stranded copper wire Colors and connections specified per application. A Telephone cable will be 4 conductor type UL 2464 Individual conductors will be 22 AWG solid copper. 3 All wires will be routed through flexible metal conduit and metal junction boxes outlet boxes. A All power lines will be routed through 1 2 flexible metal conduit. B Telephone data cable will be routed through 3 8 flexible metal conduit. C Nurse call and communication lines will be routed through 3 4 flexible metal conduit. 4 The jumper wire connecting the emergency power circuit ground bus bar and the normal power circuit. ground bus bar will be 10 AWG type AWM copper wire green insulation All ground bus bars will be. located in their respective junction boxes, 5 Equipment bonding and device bonding will be in accordance with NFPA NEC 1993. OmniWall t OmniDockertInstallation Instructions, OMNIWALLt TRANSFORMER JUNCTION BOX ELECTRICAL SCHEMATIC.
1 Attach the jumper wires to the transformer terminals Match the number on the spade receptacle to the. transformer receptacle, 2 Wire nuts qty of 5 should be selected according to wire size and number of wires Panduit p n P72 C. 3 All wires shall be 18 AWG stranded copper, OmniWall t OmniDockertInstallation Instructions. OMNIWALLt WIRING DIAGRAM FOR CONNECTING LIGHT FIXTURE CONTROL BOARD. OMNIWALLt LIGHT FIXTURE WIRING DIAGRAM, OmniWall t OmniDockertInstallation Instructions. OmniWall Ballast part number 3100 004 002, OmniWall Bulb part number 3100 004 003. OmniWall Light Control Assembly 3100 002 675, Infant OmniWallt Installation Instructions.
INFANT OMNIWALLt ROUGH IN LOCATIONS, ROUGH IN CONTRACTOR TO SUPPLY THE FOLLOWING. 1 A single gang opening for each branch circuit Openings to be located in electrical drop location. OmniWallt connects to hospital circuit via flexible metal conduit with a single gang cover plate attached. 2 Gas lines stubbed through drywall in gas drop location. A All ground bus bars will be located in their respective junction boxes 5 Equipment bonding and device bonding will be in accordance with NFPA NEC 1993 MOUNTING NOTES Step down transformer and lighting control relay board are mounted to the inside surface of their respective junction box covers

Related Books

2012 Volt A Volt 2012 A North Dakota Department of

2012 Volt A Volt 2012 A North Dakota Department of

Say hello to Volt the electric vehicle from Chevrolet that can use gas but only if you need it to Powered by electricity the Volt does everything any great car does it s further proof that today tomorrow and into the future Chevy Runs Deep 2012 Chevrolet Volt 2011 Volt shown

2012 Chevrolet Volt Owner Manual M

2012 Chevrolet Volt Owner Manual M

Chevrolet Volt Owner Manual 2012 Black plate 4 1 iv Introduction Using this Manual To quickly locate information about the vehicle use the Index in the back of the manual It is an alphabetical list of what is in the manual and the page number where it can be found Danger Warnings and Cautions Warning messages found on vehicle

TOYOTA NAVIGATION SYSTEM

TOYOTA NAVIGATION SYSTEM

TOYOTA NAVIGATION SYSTEM PART NUMBER NAVIGATION KIT PART N 08545 00803 TOYOTA MOTOR CORPORATION INSTALLATION INSTRUCTIONS FOR T23 R Manual Ref Nr N1RT23 0 00 09 99 Celica RHD 2 Celica TNS 500 PRECAUTIONS Do not pinch the rear wiring or har ness in the tightened part PLEASE READ THOROUGHLY THESE PRECAUTIONS BEFORE THE INSTALLATION Be sure to disconnect the negative lead

The Efficiency Experts Gear Technology

The Efficiency Experts Gear Technology

uses for a wire EDM machine once you have one on the shop floor People still aren t as comfortable with the process Coward at Makino notes that the wire EDM process can accomplish angles and cuts that might be difficult for other cutting techniques courtesy of Makino EDM pgs 30 35 indd 34 6 14 2010 1 20 55 PM continued

Hard Milling

Hard Milling

in hard milling His shop Cut Rite EDM Inc specializes in advanced wire electrical discharge machining EDM and he was exploring hard milling as a complement or alternative to EDM Mr Sizemore believed that a counterpart to his EDM shop was needed to service shops looking for hard milling capacity and experience With Mr Sizemore s support Mr Green wald opened Hard Milling

Industry 4 0 Manufacturing s Next Move

Industry 4 0 Manufacturing s Next Move

on both Makino Wire and Sinker EDM machines and contains many helpful advanced functions that support the every need of the operator to boost productivity The machine also comes standard with the HyperConnect IIoT network connectivity function for remote machine monitoring and interconnectivity of all manufacturing information The UP6 HEAT will also feature a new Wire Drive and Wire

April 2007 EDM Publications

April 2007 EDM Publications

Makino wire or Ram machines to take any part and put a hole or a slot in it anywhere on the part no matter how small the part and no matter how small the hole or slot says Larjanko As much as we like our screw machines they just can t do everything says Larjanko The Makino EDM

Getting Wired into EDM geartechnology com

Getting Wired into EDM geartechnology com

Wire electrical discharge machining wire EDM or spark machining is an extremely accu rate manufacturing process The predictable and easy to automate technique was commercially developed in the 1970s allowing manufacturers to work with harder materials while maintaining pre cision cutting It s a process that involves a thin single strand metal wire in conjunction with de ion ized water

OWNER S MANUAL FAX 5750e Brother

OWNER S MANUAL FAX 5750e Brother

FAX 4100e FAX 4750e OWNER S MANUAL FAX 5750e Version B If You Need to Call Customer Service Please complete the following information for future reference Model Number FAX 4100e FAX 4750e FAX 5750e Circle your model number Serial Number Date of Purchase Place of Purchase The serial number is on the back of the unit Retain this manual with your sales receipt as

Printer Manual FAX 4100 4100e Brother

Printer Manual FAX 4100 4100e Brother

Using the Brother FAX 4100 4100e Printer Driver A Printer Driver is software that translates data from the format used by a computer into the format required by a particular printer