Gb User S Manual Gb-Books Pdf

GB USER S MANUAL GB
01 Sep 2020 | 3 views | 0 downloads | 25 Pages | 824.19 KB

Share Pdf : Gb User S Manual Gb

Download and Preview : Gb User S Manual Gb

Report CopyRight/DMCA Form For : Gb User S Manual Gb



Transcription

INTRODUCTION, Thanks you for choosing this product of the DIALOG DUAL range. Riello UPS are renowned specialists in the development and production of uninterruptible power supplies. UPS The UPS in this range are high quality products designed and built with care in order to give you the. best performance, This equipment can be installed by anyone subject to CAREFULLY AND THOROUGHLY READING. THIS MANUAL, The manual contains detailed instructions on how to use and install the UPS. For information on using and getting the best performance from your UPS this manual should be. kept safely in the vicinity of the UPS and CONSULTED BEFORE TAKING ANY ACTION ON THE. Reproduction of any part of this manual including partial is strictly prohibited without the prior consent of the manufacturer. For the purpose of improving it the manufacturer reserves the right to modify the product described herein at any time and without. Microsoft Windows and the Windows logo are trademarks or registered trademarks of Microsoft Corporation in the United States. and or other countries, PRESENTATION 44, UPS VIEWS 45. DISPLAY MASK VIEW 46, INSTALLATION 47, OPENING THE PACKING AND CHECKING CONTENTS 47.
TOWER VERSION 48, RACK VERSION 49, CONNECTIONS AND SWITCHING ON FOR THE FIRST TIME 50. SWITCHING ON FROM THE MAINS 50, SWITCHING ON FROM THE BATTERY 50. SWITCHING THE UPS OFF 50, DISPLAY PANEL INDICATIONS 51. UPS status indicators 51, Measurements display area 52. Configuration area 53, MODES OF OPERATION 54, UPS CONFIGURATION 55.
COMMUNICATION PORTS 57, RS232 and USB connectors 57. Communication Slot 57, SOFTWARE 58, Monitoring and control software 58. Configuration software 58, BATTERY PACK 59, REPLACEMENT OF THE BATTERY PACK 59. PROBLEM SOLVING 60, ALARM CODES 62, TECHNICAL DATA TABLE 64. PRESENTATION, The new DIALOG DUAL UPS family has been designed with a special eye to versatility These UPS.
depending on the user s requirements can in fact be installed either in tower version or in rack version by. means of a suitable handles kit option The 2 different product versions are shown below. Tower Rack, The UPS also has a dedicated battery pack that permits easy replacement of the batteries hot swap entirely. safely for the operator thanks to the protected connection system. DLD 330 DLD 400, Nominal power VA 3300 4000, Nominal voltage Vac 220 230 240. Dimensions H x L x D mm 455 x 175 x 520 1, Weight Kg 38. In the rack version with the handles installed the H dimension changes as follows 483mm x 175mm x 520mm H. Note 175mm 4U, PRESENTATION, Release slots, Extractable rotatable. display mask, Manual bypass, switch General switch.
Cable with, terminal Removable front, Battery pack. Front view, front panel off front panel on, USB RS232 communication port. communication, COMMUNICATION SLOT, Expansion slot, Input thermal protection. IEC 16A Inlet, Battery expansion, IEC 10A outlets, IEC 16A outlet. PRESENTATION, DISPLAY MASK VIEW, SEL SET button, ON button STBY button.
Operating normally 7, Configuration area, Operating on mains power 8. Maintenance action required, Operating on battery power 9. Load powered from bypass 10, Measurements display area. Battery back up indicator 11, Stand by alarm, Load level indicator. INSTALLATION, OPENING THE PACKING AND CHECKING CONTENTS.
After opening the pack the first thing to do is make a check of the contents. The pack should contain, UPS 2 plastic covers, top panels. Power cord 2 plastic keys, Schuko plug IEC 16A socket for releasing the display. 2 IEC 10A connection cables RS232 serial cable, IEC 16A spare socket User manual CD ROM with software. INSTALLATION, TOWER VERSION, This chapter describes the work needed to prepare the UPS for use in tower version. WARNING for your own safety and that of your product it is important that you follow the instructions. given below exactly, BEFORE PROCEEDING TO PERFORM THE SEQUENCE OF.
OPERATIONS DESCRIBED MAKE SURE THAT THE UPS IS SWITCHED. OFF COMPLETELY AND IS NOT CONNECTED TO THE ELECTRICAL. MAINS OR LOAD OF ANY KIND, Once removed from its packaging the UPS is already prepared for installation in tower configuration. To complete the configuration all that is needed is to fit the two plastic covers provided on the top part of. the UPS as described below, the 2 covers have a snap fit fastening system. identify the special holes for mounting of the covers in the top part. of the UPS and taking the utmost care fit the covers exerting a. slight pressure see figure to the side, Note as the covers are perfectly identical they can both be fitted. in either of the areas front back on the top of the UPS without. any problem, INSTALLATION, RACK VERSION, This following describes the work needed to convert the UPS into rack version. WARNING for your own safety and that of your product it is important that you follow the instructions. given below exactly, BEFORE PROCEEDING TO PERFORM THE SEQUENCE OF.
OPERATIONS DESCRIBED MAKE SURE THAT THE UPS IS SWITCHED. OFF COMPLETELY AND IS NOT CONNECTED TO THE ELECTRICAL. MAINS OR LOAD OF ANY KIND, 1 First and foremost remove the 4 feet on the. bottom of the UPS Set the UPS horizontal 1 2, taking the utmost care and using a small. flat blade screwdriver lift gently the pin, placed in the centre of the foot Once raised. take the pin out from the base of the UPS, Repeat this sequence for the other. remaining feet The exact sequence is, depicted in the figure to the side.
2 With all the feet removed now proceed to rotate the display mask Slip. the keys provided into the release slots on the sides of the display mask. and exert a slight pressure just enough to release the mask from the. UPS as demonstrated in the drawing on the side, 3 WARNING The display mask is connected to the UPS by a special cable This means that you must. extract the mask taking extreme care and avoiding violent jerks or other brusque movements so as to. avoid possibly damaging the display and or the UPS DO NOT TRY IN ANY WAY TO. SEPARATE THE DISPLAY MASK FROM THE UPS, 4 Rotate the mask by 90 in the anti clockwise direction and fasten it to the UPS again inserting it. gently into the housing until a slight clicking noise is heard and the mask remains in position. 5 Rotate the UPS by 90 clockwise taking the utmost care. 6 At this point with the UPS in the horizontal position attach the handles. to the side of the UPS with the appropriate screws as depicted in the. figure to the side handles and screws are include in the handles kit. NOTE The UPS is compatible with assembly in standard rack cabinets of 600mm x 800mm or greater in. depth In rack type installation given the weight of the UPS use of the support brackets is. compulsory guide with L shape support For the same reason it is recommended that you install. the UPS in the bottom part of the rack cabinet, CONNECTIONS AND SWITCHING ON FOR THE FIRST TIME. 1 Install upstream of the apparatus a 16A magneto thermal switch with intervention curve B or C. 2 Connect the power cord supplied with the UPS to the IEC 16A inlet socket. 3 Connect the power cord from the UPS to the mains. 4 Press the main switch on the front panel, 5 After a short time the UPS comes on the display lights a beep sounds and the icon blinks. The UPS is in stand by mode this means that the UPS is in a minimum consumption condition The. microcontroller is powered and performs its supervision and self test task the batteries are charging. everything is ready for activation of the UPS There is also a stand by operating mode when in. battery powered operation provided the timer has been activated. 6 Connect the item s of equipment to be powered to the outlets on the rear of the UPS using the cable. supplied or another cable of max length 10 metres, WARNING do not connect equipment that absorbs more than 10A to the IEC 10A outlets For.
equipment items exceeding this level of absorption use only the IEC 16A socket. 7 Check the machine settings on the display see the section Configuration area. SWITCHING ON FROM THE MAINS, 1 Press the ON button After it has been pressed all the icons on the del display light for 1 second. and the UPS sounds a beep, 2 Switch on the equipment item s connected to the UPS. Only when switching on for the first time after about 30 sec have elapsed check that the UPS is. working properly, 1 Simulate a black out by opening the switch placed upstream of the UPS. 2 The load must continue to be powered the icon on the display must light and a beep must. be heard every 4 seconds, 3 When the upstream switch is closed again the UPS should return to mains powered operation. SWITCHING ON FROM THE BATTERY, 1 Press the main switch on the front panel.
2 Hold the ON button down for at least 5 seconds All the icons on the display light for 1 second and. the UPS sounds a beep, 3 Switch on the equipment item s connected to the UPS. SWITCHING THE UPS OFF, To switch the UPS off hold down the STBY button for at least 1 5 seconds The UPS returns to stand by. mode and the icon starts blinking, a If the mains line is up to switch the UPS off completely press the main switch bringing this. switch back into its original position raised position. b If the UPS is on battery powered operation and the timer has not been set it switches off. completely and automatically after 5 seconds If on the other hand the timer is set to switch the. UPS off hold the STBY button down for at least 5 seconds If you want the UPS to remain. switched off completely when the mains power returns then press the main switch see step a. DISPLAY PANEL INDICATIONS, This chapter will describe in depth all the items of information that may be posted on the LCD. For easier understanding we can divide the information displayed into three main groups. UPS status indicators, Measurements display area, Configuration area.
UPS status indicators, ICON STATUS DESCRIPTION, Fixed Indicates presence if a problem. Blinking The UPS is in stand by mode, Fixed Indicates UPS operating normally. Fixed The UPS is working on mains power, The UPS working on mains power but the output voltage is not. synchronized with the mains voltage, The UPS is working on battery power When in this condition the UPS. emits a beep at 4 second regular intervals, End of discharge early warning Indicates that the battery s back up is.
Blinking running out In this condition the UPS emits a beep at 1 second regular. Indicates that the loads connected to the UPS are being powered by the. Dynamic Indicates the estimated percentage back up. Indicates the load applied to the UPS with respect to the nominal. Blinking Maintenance action is needed, Indicates that the timer is activated programmed switch on or switch. Fixed off The timer can be activated de activated through the software. 1 minute to go before the UPS is switched on again or 3 minutes until it. is switched off, Measurements display area, The most important measurements relating to the UPS may be displayed on the display screen. When the UPS is switched on the display shows the mains voltage value. To move on to display something else press the SEL SET button repeatedly until the desired. measurement value appears, If a failure alarm occurs FAULT or the machine stops LOCK the display will automatically display the. type of problem and the corresponding alarm code, A number of examples are shown below. SAMPLE GRAPHIC DESCRIPTION SAMPLE GRAPHIC DESCRIPTION. Mains voltage Total battery voltage, Mains frequency Percentage load applied.
Current absorbed by the, UPS output voltage, Temperature of the. Output voltage frequency cooling system of the, UPS internal electronics. Fault Alarm 2 the, Remaining battery backup corresponding code is. Lock 2 the, Battery charge percentage corresponding code is. The values given in the pictures of the table are purely indicative. The FAULT LOCK codes will only be displayed if they are active at that time in presence of a failure alarm or. machine stoppage, Configuration area, The configuration area contains the main operating parameters of the UPS and displays its current status The.
parameters found in this area can be modified by taking action directly from the display panel. SETTABLE PARAMETERS, Frequency output voltage frequency. Voltage Output voltage Voltage, Mode UPS operating mode. The picture to the side depicts the area of the display reserved. for settings configuration area with the three settable. parameters in view, How to proceed, To enter the configuration area hold down the SEL SET button for at least 2 sec. The word SET lights and an arrow appears to the left of Frequency. The arrow indicates the setting selected To change the selection of the parameter to be modified. press the SEL SET button, To change the item selected press the ON button. To exit from the configuration area hold the SEL SET button down for at least 2 sec. POSSIBLE SETTINGS, Frequency 50 Hz 60 Hz Off frequency self teach.
Voltage 220 V 230 V 240 V, Mode ON LINE ECO SMART STBYOFF. NOTE For the change in configuration of output frequency to become effective the UPS must be switched. off completely and switched on again by the main switch. THE PARAMETERS VOLTAGE AND OUTPUT FREQUENCY MUST BE. Thanks you for choosing this product of the DIALOG DUAL range Riello UPS are renowned specialists in the development and production of uninterruptible power supplies UPS The UPS in this range are high quality products designed and built with care in order to give you the best performance This equipment can be installed by anyone subject to CAREFULLY AND THOROUGHLY READING THIS MANUAL

Related Books

TECHNICAL RECOMMENDATIO FOR HIGHWAYS

TECHNICAL RECOMMENDATIO FOR HIGHWAYS

TECHNICAL RECOMMENDATIONS FOR HIGHWAYS TRH have traditionally been aimed at informing the practising engineer about current recommended practise in selected aspects of highway engineering based on proven South African experience

C THR12 67 SAPSPOT

C THR12 67 SAPSPOT

C THR12 67 Practice Test ERPPrep com s C THR12 67 PDF is a comprehensive compilation of questions and answers that have been developed by our team of SAP HR experts and experienced professionals To prepare for the actual exam all you need is to study the content of this exam questions You can identify the weak area with our premium C THR12 67

Conflicts of Interest Ethics amp Compliance Initiative

Conflicts of Interest Ethics amp Compliance Initiative

This report is published by the Ethics Research Center ERC the research arm of the Ethics amp Compliance Initiative ECI Library of Congress Cataloging in Publication Data ISBN 978 0 916152 30 7 All content contained in this report is for informational purposes only ECI cannot accept responsibility for any errors or omissions or any liability resulting from the use or misuse of any

Responsibility and ethical culture in banking and

Responsibility and ethical culture in banking and

Responsibility and ethical culture in banking and finance SUSTAINABILITY FOCUS 2 SUSTAINABILIT FOCUS Key takeaways The ongoing and serious cases of misconduct in banking and finance sectors since the financial crisis of 2008 2009 undermine trust in financial markets and threaten banks license to operate A strong ethical culture is considered essential to make banks less prone to

CODE OF ETHICS AfrAsia Bank Limited

CODE OF ETHICS AfrAsia Bank Limited

including a Code of Ethics for the banking sector The Code has now been updated The Code of Ethics sets out a common set of universally acclaimed principles pertinent to all banks over and above those that they subscribe to as part of their internal Code of Ethics with a view to further develop the commitment of the banking industry towards its customers and the community at large through

PRINCIPLES OF BANKING ETHICS

PRINCIPLES OF BANKING ETHICS

PRINCIPLES OF BANKING ETHICS I Introduction Ethics can be defined as a system of criteria and measures examining the values norms and rules underlying the individual and social relations on such moral grounds as right and wrong or good and bad Professional ethics regulates the relationships of members of the relevant profession with each other and with society and defines

BANKING ETHICS MAIN CONCEPTIONS AND PROBLEMS

BANKING ETHICS MAIN CONCEPTIONS AND PROBLEMS

Banking ethics rules being highlighted as a separate class have long evolved with the development of financial activities which in time became banking Many experts believe that the banking ethics is a form of professional ethics in the field of finance which exists along with the universal principles of morality and is characterized by specific norms of human behavior in its specific

Auditoria financeira Presid ncia da Rep blica Ano

Auditoria financeira Presid ncia da Rep blica Ano

CA da Presid ncia da Rep blica o rg o deliberativo m ximo em mat ria de gest o patrimonial administrativa e financeira da PR18 SGPR servi o de apoio administrativo da PR competindo lhe assegurar o funcionamento dos servi os administrativos incluindo os servi os respeitantes Chancelaria das Ordens Honor ficas Portuguesas executar as delibera es do CA e em geral

Presid ncia da Rep blica Governo Federal

Presid ncia da Rep blica Governo Federal

Presidente da Rep blica nos assuntos relacionados soberania nacional e defesa do Estado Democr tico e a Presid ncia da C mara de Rela es Exteriores e Defesa Nacional do Conselho de Governo Creden Os desafios que a realidade atual imp e aos antigos modelos de consolida o da democracia e de amplo respeito s institui es colocam neste Gabinete a responsabilidade de cont

Manual de PR TICAS RESTAURATIVAS

Manual de PR TICAS RESTAURATIVAS

Rep amp blica Tribunal de Justi a do Estado do Rio Grande do Sul Parceiros Institucionais 3 Promotora de Justi a da Promotoria de Justi a Es pecializada da Inf ncia e da Juventude de Porto Ale gre

estatico cnpq br

estatico cnpq br

Presid ncia da Rep blica Secretaria de Pol ticas para as Mulheres Presid ncia da Rep blica Elabora o distribui o e informa es Secretaria de Pol ticas para as Mulheres Presid ncia da Rep blica Via N1 Leste s n Pavilh o das Metas Pra a dos Tr s Poderes Zona C vico Administrativa 70150 908 Bras lia DF Fone 61 3411 4330 Fax 61 3327 7464 spmulheres spmulheres gov br www