Appendix L Review Checklist Templates-Books Pdf

Appendix L Review Checklist Templates
22 Dec 2019 | 33 views | 0 downloads | 10 Pages | 228.91 KB

Share Pdf : Appendix L Review Checklist Templates

Download and Preview : Appendix L Review Checklist Templates


Report CopyRight/DMCA Form For : Appendix L Review Checklist Templates



Transcription

Review Checklist Templates Appendix L, 30 60 90 Final Summary of Quantities Not sealed by TE. All items are included and quantities and units are consistent with estimate vital at. All appropriate groups are assigned vital at Final. Control Section and Tax Schedule for each group are correct vital at Final. 30 60 90 Final Other,Plans Civil C Series Sheets,30 60 90 Final Legend Abbreviations General Notes. All symbols within the Plans are included and defined. All abbreviations within the Plans are included and defined. General notes are appropriate and applicable to work of the Plans. 30 60 90 Final Existing Conditions, Upland topography is shown with appropriate line weight and accurate. Bathymetry and elevations are shown with appropriate line weight and accurate. Boring locations are shown identified and accurate in their location. R W DNR Lease easements and other property lines are shown and consistent with the. Sundry Site Plan, All existing features and elements are clearly identified. Horizontal and vertical control is established, Horizontal and vertical datum is identified and includes epoch date.
Survey monument identification is correct as compared to WSDOT Survey Monument. Database typically use ID, Survey monument coordinates are in English units and in the Washington State Plane. coordinate system, Survey monument elevations are in English units and in the referenced vertical datum. typically MLLW,30 60 90 Final Existing Utilities, Upland topography is consistent with Existing Conditions sheets. Bathymetry and elevations are consistent with Existing Conditions sheets. Underground utilities are shown using appropriate symbols line types and scales and are. Overhead utilities are shown using appropriate symbols line types and scales and are. R W DNR Lease easements and other property lines are shown and consistent with. Existing Conditions sheets, All applicable site and utility features and elements are clearly identified. 30 60 90 Final Construction Phasing, Existing conditions shown are consistent with Existing Conditions sheets.
Bathymetry and elevations are consistent with Existing Conditions sheets. Entire project scope is included and phased, Phased work identified includes a sequenced phase note callout. Phasing Notes are include for all callouts, R W DNR Lease easements and other property lines are shown and consistent with. Existing Conditions sheets, All applicable features and elements are clearly identified. Existing utilities shown only as applicable,Page L 2 WSFCivil PS E. Terminal Review,Design Checklist,Manual Page 2,April 2016.
Appendix L Review Checklist Templates,30 60 90 Final Construction Staging. Upland topography is consistent with Existing Conditions sheets. Bathymetry and elevations are consistent with Existing Conditions sheets. R W DNR Lease easements and other property lines are shown and consistent with. Existing Conditions sheets, All applicable existing features and elements are clearly identified. Upland and in water staging areas clearly identified including hatching and dimensioned. to local control,All access points are clearly identified. All restrictions are identified in the Notes,30 60 90 Final Demolition Plans. Upland topography is consistent with Existing Conditions sheets. Bathymetry and elevations are consistent with Existing Conditions sheets. R W DNR Lease easements and other property lines are shown and consistent with. Existing Conditions sheets, Existing utilities consistent with Existing Utilities sheets.
All applicable existing features and elements are clearly identified. All demolition work of project is identified and appropriately referenced to discipline. plan sheets i e see Civil Structural Mechanical or Electrical sheets. Demolition call outs accurately describe the nature and limits of the work. All salvage and relocation items are clearly identified. All utility demolition is identified by cross hatch. 30 60 90 Final Site Layout, Upland topography is consistent with Existing Conditions sheets. Upland topography is consistent with new contours shown. Bathymetry and elevations are consistent with Existing Conditions sheets. R W DNR Lease easements and other property lines are shown and consistent with. Existing Conditions sheets, Existing utilities consistent with Existing Utilities sheets. All applicable features and elements are clearly identified. Surveying information and applicable datum are shown. Vertical datum includes epic date typically MLLW,Work points are identified. Work point coordinates are in English units and in the Washington State Plane coordinate. Work point elevations are in English units and in the referenced vertical datum typically. All new work of project is identified and appropriately referenced to discipline plan. sheets i e see Civil Structural Mechanical or Electrical sheets. All new work of project is coordinated between discipline plan sheets i e see Civil. Structural Mechanical or Electrical sheets, All new work is clearly delineated from existing conditions. Only new work is shown i e All existing work replaced by new work is removed from. plan sheets, New work call outs accurately describe the nature and limits of the work.
WSF Terminal Design Manual M 3082 04 Civil PS E Review Checklist. April 2016,Review Checklist Templates Appendix L,30 60 90 Final Civil Site Work. Upland topography is consistent with Existing Conditions sheets. Bathymetry and elevations are consistent with Existing Conditions sheets. R W DNR Lease easements and other property lines are shown and consistent with. Existing Conditions sheets, Existing utilities consistent with Existing Utilities sheets. All applicable features and elements are clearly identified. All civil work of project is identified, All new work is shown and clearly delineated from existing conditions. Only new work is shown i e All existing work replaced by new work is removed from. plan sheets, Civil work call outs accurately describe the nature and limits of the work and are. consistent with Site Layout,30 60 90 Final Civil Plans Details.
Upland topography is consistent with Existing Conditions sheets. Bathymetry and elevations are consistent with Existing Conditions sheets. R W DNR Lease easements and other property lines are shown and consistent with. Existing Conditions sheets, Existing utilities consistent with Existing Utilities sheets. All applicable features and elements are clearly identified. Civil work clearly identified and dimensioned in appropriate units coordinates. Reference dimensions are indicated as appropriate,New utilities are shown and complete. Pavement removal limits are clearly shown and dimensioned. Grading limits are clearly shown and dimensioned,Trenching and cut and fill limits are shown. HMA limits are clearly shown and dimensioned,Slopes for drainage are shown and clear. Pavement sections are shown and detailed, Utility elevations are consistent between plans and profiles.
Drainage structure grate and invert elevations are shown and in the referenced vertical. Signing and striping is shown and complete, ADA parking and access are shown and have been coordinated with Architecture. 30 60 90 Final Other,Page L 4 WSFCivil PS E,Terminal Review. Design Checklist,Manual Page 4,April 2016,Appendix L Review Checklist Templates. Plans Biddability Constructability,30 60 90 Final, Contractor staging is shown and adequate and coordinated with Operations and the. specifications, Phasing plans are shown and cover all work and coordinated with Operations and the.
specifications, Traffic control is shown and complete and coordinated with Operations. Plans are consistent between all disciplines, Plans are clear in representing delineating the work. SOQ items are consistent with Payment sections of the specifications in title and unit of. measure vital at Final,Identify any Value Engineering Opportunities. Specifications,30 60 90 Final, All work of the Plans is addressed by a specification. All applicable current Amendments to the Standard Specifications are included. All applicable WSDOT General Special Provisions are included. All applicable WSF Special Provisions are included. Contract Working Days is consistent with the engineer s construction schedule. All indexed specifications are included and titles are consistent. All specifications contain Description Materials Construction Requirements. Measurement and Payment sections, Description sections clearly and accurately define the scope of work.
Payment sections are consistent with the SOQ items in title and unit of measure vital at. All lump sum items contain approximate quantities for bidding or are biddable from the. contract documents,All force account items are defined. All sole source proprietary items have been approved by WSF or ASDE as appropriate. and documentation is in the project files,Soil boring logs are included in the Appendices. Environmental and Jurisdictional permits are included in the Appendices. Hazardous Materials reports are included in the Appendices. Federal Aid Special Training Provisions have been addressed. WSF Terminal Design Manual M 3082 04 Civil PS E Review Checklist. April 2016,Review Checklist Templates Appendix L,30 60 90 Final. All work of the Plans and specifications is included in the estimate. All unit prices have been reviewed and verified by Project Controls. All lump sum items have backup estimates,All force account items have justification. All contingencies have been validated,Mobilization is included.
All EBase items are consistent with the SOQ items and Payment sections of the. specifications vital at Final, All EBase quantities unit prices match the estimate. The EBase contingencies match the estimate,Page L 6 WSFCivil PS E. Terminal Review,Design Checklist,Manual Page 6,April 2016. Appendix L Review Checklist Templates,CIVIL CONSTRUCTABILITY REVIEW CHECKLIST Legend. Project Title Project Number Acceptable,Submittal Not Acceptable.
Not Applicable,Plans Constructability,Entire project scope is shown. Upland topography shown is accurate,Existing conditions shown are accurate. Existing utilities shown are accurate,Verify connection points of all utilities. Verify all utility systems are shown are complete, Horizontal and vertical control shown is accurate and accessible. Contractor staging shown is adequate and accessible. Verify work areas defined are adequate, Verify work areas defined are accessible and free of horizontal and vertical site constraints.
Verify work areas defined are free of dangerous conditions. All site features have been accounted for in demolition. All salvage items have been included, Phasing and schedule of work does not interfere with other disciplines. Specifications Constructability, All work of the Plans is included in the specifications. All demolition work shown on the Plans matches the scope defined in the specifications. All necessary survey work is included and accessible. All salvage items have been included,All permits are included in the Appendices. Estimate Constructability, All work of the Plans and specifications is included in the estimate. WSF Terminal Design Manual M 3082 04 Civil Constructability Review Checklist. April 2016,Review Checklist Templates Appendix L,CIVIL CHECK CHECKLIST Legend.
Project Title Project Number Acceptable,Submittal Not Acceptable. Not Applicable,Plans General,Title block includes PSE project number. Title block includes Designed By Drafted By and Checked By initials and dates. All line types and symbols are included on the Legend. All abbreviations are included on the Abbreviations list. General Notes are consistent with work shown, General Notes include language requiring Contractor to verify existing underground utility. locations prior to excavation, All Plan sheet names numbers are consistent with the Civil plan sheet index. SOQ sheet includes all civil bid items,Plans Engineering.
All civil work is indicated on the Site Plan,Demolition work is clearly shown. All civil work is consistent with Environmental provisions. Reference dimensions are indicated, Upland topography is shown and accurate to existing conditions. Bathymetry and elevations are shown and accurate, Surveying information is shown and accurate to existing conditions. Horizontal and vertical control is established accurate and complete. Boring locations are shown and accurate, R W DNR Lease easements and other property lines are shown and accurate. Grading limits are clearly shown and field measureable to established control. Excavation and backfill limits are shown, Pavement sections are shown and appropriate for the location.
Geotechnical recommendations have been incorporated. Paving limits are shown and field measureable to established control. Existing utilities are clearly shown and accurate to existing conditions and records. New utilities are clearly shown and identified and conflicts have been resolved. Slopes for drainage are adequate and all areas drain to a collection point. Drainage structures are located to established control. Utility profile elevations are consistent with plan elevations. Roadway holding lane and parking improvements are shown and located to established control. Curb gutter sidewalks and ramps are correctly located and identified to established control. Signing and striping is identified and located to established control. All references to Standard Plans are current and correct. ADA requirements are identified and consistent with code. Storm Drain System,Check water quality design and details. Check that all materials used are appropriate for the application. Check that pervious surface drainage is adequate and connected to storm system. Check curb and gutter drain locations, Crosscheck contours and grate spot elevations for proper drainage slopes. Check number and locations of storm inlets,Civil Constructability Review Checklist Page 2. Page L 8 WSF Terminal Design Manual M 3082 04,April 2016. Appendix L Review Checklist Templates,Check size and slope of storm drains.
Crosscheck plan and profile horizontal dimensions and compare to established control. Check storm drain invert elevations against contours no exposed or shallow piping. Check drain grate and manhole rim elevations against topography. Check that structure drain systems are connected to storm system. Check storm drainage details,Check cathodic protection system and details. Sanitary Sewer System,Review adequacy of sewage system capacity. Check lift station design and details, Check that point s of connection to existing system is shown. Check flow velocity, Check that mains provide gravity flow from laterals. Check adequate separation from water lines, Check inverts of mains and laterals for adequate drops.
Check adequate dimensions for manhole locations,Check cleanout locations. Check details, Check that all materials used are appropriate for the application. Check cathodic protection system and details,Plans Biddability Constructability. Civil work areas are adequate for type s of work to be performed. Civil work areas are accessible and free of horizontal and vertical site constraints. Civil work areas are free of dangerous conditions,Check if shoring is required for excavation. Check if dewatering is required for excavation,Specifications.
All civil work is included in the specifications, Check for shoring and dewatering specification language. Check that all civil quantities are obtainable from the Plans. All civil special provisions contain Description Materials Construction Requirements. Measurement and Payment sections, Civil special provision description sections clearly and accurately define the scope of work. Check that the term shall is used for all Contractor responsibilities. Check that the term will is used for all State responsibilities. Check that all items requiring submittal are identified. Check that all testing requirements are identified. Payment sections are consistent with the SOQ items in title and unit of measure. All lump sum items contain approximate quantities for bidding. All force account items are defined, Appropriate environmental provisions and BMPs are included in special provisions. Appropriate hazardous materials procedures are included in the special provisions. Check that all references to Standard Specifications Special Provisions Standard Plans and other. standards and codes are current and correct, Special Provisions contain applicable Regional Special Provisions for WSF projects. Special Provisions contain applicable WSDOT General Special Provisions. Civil Constructability Review Checklist Page 3,WSF Terminal Design Manual M 3082 04 Page L 9.
April 2016,Review Checklist Templates Appendix L,All civil work is included in the estimate. All unit prices are for in place work and do not include contingency or mobilization. All lump sum prices are for in place work and do not include contingency or mobilization. All force account items are identified,Construction Schedule. All civil work is included in the schedule, Civil work activities occur in the appropriate order. Civil work activities are assigned an appropriate duration. Civil work activities are assigned appropriate logic based on project scope phasing. Civil Constructability Review Checklist Page 5,Page L 10 WSF Terminal Design Manual M 3082 04.


Related Books

POP-UP CANOPY - Lowes Holiday

POP UP CANOPY Lowes Holiday

POP-UP CANOPY. 2 PACAGE CONTENTS Lowes.com/gardentreasures PART DESCRIPTION QUANTITY A Frame 1 B Canopy 1 C Bag 1 ... straps on canopy (B) to the frame (A). 5 A B 1 A ...

Relazione finale del Dirigente Scolastico

Relazione finale del Dirigente Scolastico

Scolastico, con orario in semiesonero e la docente Lo Cicero Aurora, responsabile del plesso della Scuola Secondaria, le docenti Martinelli Elsa per la Scuola Primaria di Capodimonte, Terraroli Roberta per la Scuola Primaria di Macina, Bertoloni Antonella la Scuola Primaria di Capoluogo e Malagoli Monica e De

USE AND CARE GUIDE - The Home Depot

USE AND CARE GUIDE The Home Depot

We warrant the frame and fabric to be free of manufacturing defects to the original purchaser for one year. WHAT IS NOT COVERED Contact the Customer

AL -USRAH ACTIVITIES REPORT FROM THE SECRETARIAT

AL USRAH ACTIVITIES REPORT FROM THE SECRETARIAT

Al -Usrah Orphanage Al-Usrah stood up to be counted during Amasa Firdaus unj ust treatment at Nigerian Law School we issued a press statement which many applauded to be apt as it was instrumental in put ting the issue in public discuss. Al-Usrah will henceforth be focal an d will be a voice

MOD CLEARSPAN TRUCTURES - Warner Shelter Systems Limited

MOD CLEARSPAN TRUCTURES Warner Shelter Systems Limited

galvanized steel frames are assembled to ... Protect Canopy 2007 WSSL Tent - C ... Weft inserted 9X9 Weft inserted 9X9 -1000 polyester

The Effects of Sildenafil Citrate (Viagra) in the Early ...

The Effects of Sildenafil Citrate Viagra in the Early

Effects of Sildenafil Citrate (Viagra) in the Early Phase of Healing Process in Open Wounds in Dogs. Acta Vet. Brno 2003, 72: 273-277. In vivo (n = 16) and in vitro (n = 16) experiments were conducted in dogs to describe the effects of sildenafil citrate (viagra) on histopathological changes during the healing process with respect to

Analysis and Optimization of Machining Process Using ...

Analysis and Optimization of Machining Process Using

[2] Vijayan. P and V. P. Arunachalam, Optimization of squeeze casting process parameters using Taguchi analysis .The International Journal of Advanced Manufacturing Technology Vol 33, Numbers 11-12, 2007, pp.1122-1127 [3] Nihat Tosun ,Can Cogun and Gul Tosun A study on kerf and material removal rate in wire

CCAARRBBOONN TTAAXX PPOOLLIICCYY PPAAPPEERR

CCAARRBBOONN TTAAXX PPOOLLIICCYY PPAAPPEERR

CARBON TAX POLICY PAPER, MAY 2013 4 Accrroon nyymmss baandd aabbbrreevviiaattiioonss ACSA Airports Company South Africa AUD Australian dollar

Using Time Of Use (Tou) Tariffs In Industrial, Commercial ...

Using Time Of Use Tou Tariffs In Industrial Commercial

Using Time Of Use (Tou) Tariffs In Industrial, Commercial And Residential Applications Effectively. By J Terry Cousins, TLC Engineering Solutions

CLOSING THE SKILLS AND TECHNOLOGY GAP IN SOUTH AFRICA ...

CLOSING THE SKILLS AND TECHNOLOGY GAP IN SOUTH AFRICA

closing the skills and technology gap in south africa background paper 3: the role of higher educa-tion in closing the skills gap in south africa1