10 0 Architectural Drawings-Books Pdf

10 0 ARCHITECTURAL DRAWINGS
27 Mar 2020 | 11 views | 0 downloads | 16 Pages | 1.34 MB

Share Pdf : 10 0 Architectural Drawings

Download and Preview : 10 0 Architectural Drawings


Report CopyRight/DMCA Form For : 10 0 Architectural Drawings



Transcription

LEVEL O PLAN RL 1 9,EXISTING CAIRNS,CONVENTION,CARPARK CENTRE. 87 CARS BASEMENT,CAIRNS PERFORMING FEASIBILITY STUDY. FINAL REPORT 1 500 A3,ARTS CENTRE 6th June 2013 28. LEVEL O PLAN RL 1 9,CARPARK BASEMENT EXISTING CAIRNS. 87 CARS CONVENTION,CAIRNS PERFORMING FEASIBILITY STUDY.
FINAL REPORT 1 500 A3,ARTS CENTRE 6th June 2013 29. LEVEL A PLAN RL 5 35,500 SEAT FFL 5 35,FLEXIBLE 2,FFL 5 35 FFL 4 35 CAIRNS EXISTING CAIRNS. BAR CONVENTION CONVENTION,TOILETS LOADING 3 CENTRE CENTRE. STALLS STAGE,TOILETS ROOM,CAIRNS PERFORMING FEASIBILITY STUDY. FINAL REPORT 1 500 A3,ARTS CENTRE 6th June 2013 30.
LEVEL B PLAN RL 8 15,VOID TO EXISTING CAIRNS,CONVENTION CONVENTION. TO 3 CENTRE CENTRE,LOADING EXPANSION,VOID TO TOILETS. STALLS STAGE,CAIRNS PERFORMING FEASIBILITY STUDY,FINAL REPORT 1 500 A3. ARTS CENTRE 6th June 2013 31,LEVEL C PLAN FFL 10 95. VOID TO EXISTING CAIRNS,CONVENTION CONVENTION,VOID VOID TO 3 CENTRE CENTRE.
LOADING EXPANSION,FOYER TOILETS,CAIRNS PERFORMING FEASIBILITY STUDY. FINAL REPORT 1 500 A3,ARTS CENTRE 6th June 2013 32. LEVEL D PLAN FFL 13 75,EXISTING CAIRNS,CONVENTION,VOID TO 3 CENTRE. CAIRNS PERFORMING FEASIBILITY STUDY,FINAL REPORT 1 500 A3. ARTS CENTRE 6th June 2013 33,LEVEL E PLAN FFL 16 25.
EXISTING CAIRNS,CONVENTION,CHILLER 3 CENTRE,CAIRNS PERFORMING FEASIBILITY STUDY. FINAL REPORT 1 500 A3,ARTS CENTRE 6th June 2013 34. LEVEL F PLAN FFL 21 35,EXISTING CAIRNS,CONVENTION,CAIRNS PERFORMING FEASIBILITY STUDY. FINAL REPORT 1 500 A3,ARTS CENTRE 6th June 2013 35. LEVEL G PLAN FFL 25 85,EXISTING CAIRNS,CONVENTION,CAIRNS PERFORMING FEASIBILITY STUDY.
FINAL REPORT 1 500 A3,ARTS CENTRE 6th June 2013 36. ROOM SCHEDULE THEATRE BRIEF, NO ROOM AREA 3 00 BACK OF HOUSE TECHNICAL 5 00 FRONT OF HOUSE TECHNICAL SPACES. 1 00 THEATRE 3 01 Loading dock 100 5 01 Sound control porch at rear of auditorium 15. 1 01 Auditorium Shell 30m x 26m 780 m2 3 02 Holding area temporary store 50 5 02 Lighting control room at rear of auditorium 15. Seating area stalls 700 seats includes aisles 600 3 03 Rostra and chair store 30 5 03 Audio visual control room at rear of auditorium 15. Balcony with side galleries 300 seats includes aisles 300 3 04 Piano store 18 5 04 Crying room directors interpreters room at rear of auditorium 15. 1 02 Sound locks to stalls level 20 3 05 Instrument store 15 5 05 Projection suite at rear of auditorium 15. 1 03 Sound locks to balcony level 20 3 06 Scenery workshop 40 5 06 Translation viewing room at rear of auditorium 15. 1 04 Stage area 390 3 07 Lighting store and workshop 40 5 07 Follow spot room at catwalk level at rear of auditorium in centre 18. 1 05 Stage apron 1 5m minimum deep stage apron 30 3 08 Sound bideo electronics workshop 30 Sub total m2 108. 1 06 Orchestra pit to accommodate up to 40 players 90 3 09 Rack rooms building comms 40. 1 07 Orchestra pit lift pit 52 3 10 Production office 12 6 00 FRONT OF HOUSE INCLUDING ADMIN. 1 08 Seating wagon store 60 3 11 Technician offices 25 6 01 Theatre Foyer Stalls 800. 1 09 Assembly area 8 3 12 Technical staff change room amenities showers 40 6 02 Theatre Foyer Balcony 200. 1 10 Pit assembly area 20 3 13 Wardrobe costume repair 25 6 03 Studio Foyer Stalls 400. 1 12 Rear crossover 3m wide 90 3 14 Laundry 10 6 04 Studio Foyer Balcony 100. 1 13 Lighting box booms 50 3 15 Rubbish store 10 6 05 Box Office Connect to general office 20. 1 14 Lighting bridges 54 3 16 Lift 20 6 06 Box Office Manager 10. 1 15 Perimeter access to lighting bridges 140 Sub total m2 505 6 07 Female toilets 44 WC distributed studio and theatre 105. 1 16 Speaker bridge across proscenium 40 6 08 Male toilets 6 WC and 16 urinals distributed 60. 1 17 Grid 375 4 00 BACK OF HOUSE PERFORMERS 6 09 Disabled toilets 2 Unisex 16. 1 18 Loading gallery 26 4 01 Theatre Star dressing rooms 2 at 20m2 40 6 10 General office 115. 1 19 Fly gallery 180 4 02 Theatre 5 person dressing rooms with en suite bathroom 3 at 20m2 60 6 11 Manager s office 19. 1 20 Trap room under stage 260 4 03 Theatre 20 person dressing rooms with en suite bathroom 3 at 70m2 140 6 12 Friends of theatre office 16. 1 22 Dimmer room 12 4 03 Studio 5 person dressing rooms with en suite bathroom 2 at 20m2 40 6 13 Office store and tea area 21. 1 23 Comms Room 8 4 03 Studio 15 person dressing rooms with en suite bathroom 2 at 50m2 100 6 14 Cloakroom close to entrance 10. 1 24 Scenery props and touring road case store at rear of stage 80 4 04 Shared Assembly room musicians choirs children for 100 people 100 6 15 Store for bollards display boards etc 10. 1 25 DDA lift or ramp in trap room from trap room to orchestra 10 4 05 Shared Wet dry dressing room wet and dry change 20 6 16 Artwork store 25. pit room for body painting 6 17 Sick room 18, Sub total m2 2 915 4 06 Wig and makeup room 10 6 18 Bars 50. 4 07 Toilets BOH common areas 50 6 19 Bar store 20. 2 00 STUDIO 4 08 First aid room 15 6 20 Lift 12, 2 01 Studio 20m wide by 28m long by 10m high 560 4 09 Green room to accommodate 100 people 120 Sub total m2 2 027. Retractable Seating storage at end of Studio 16m x 1 5m 27m2 4 09 Stage door reception with waiting lobby 32. 2 02 Balcony to audience side 60 Sub total m2 727 SUMMARY. 2 03 Balcony to 2 sides and stage end 105 1 00 THEATRE 2 915. 2 04 Catwalks to perimeter 92 2 00 STUDIO 1 097, 2 05 Catwalks across studio 90 3 00 BACK OF HOUSE TECHNICAL 505.
2 06 Sound locks to floor level 16 4 00 BACK OF HOUSE PERFORMERS 727. 2 07 Sound locks to balcony level 16 5 00 FRONT OF HOUSE TECHNICAL SPACES 108. 2 08 Dimmer Room 10 6 00 FRONT OF HOUSE INCLUDING ADMIN 2 027. 2 09 Comms Room 8 TOTAL AREA m2 7 379,2 10 Scenery dock at rear of studio 80. 2 11 Crossover to stage area on 2 levels 60,Sub Total m2 1 097. CAIRNS PERFORMING FEASIBILITY STUDY,FINAL REPORT,ARTS CENTRE 6th June 2013 37. SECTION 1 THROUGH 1000 SEAT AUDITORIUM, AUDITORIUM BACK OF CONVENTION CENTRE EXISTING CAIRNS. HOUSE EXPANSION CONVENTION,FOYER CENTRE,CARPARKING SUB STAGE.
LAKE STREET,CAIRNS PERFORMING FEASIBILITY STUDY,FINAL REPORT 1 500 A3. ARTS CENTRE 6th June 2013 39,SECTION 2 THROUGH 500 SEAT FLEXIBLE THEATRE. 500 SEAT EXISTING CAIRNS,FLEXIBLE BACK OF CONVENTION CENTRE. HOUSE EXPANSION CONVENTION,FOYER THEATRE STAGE CENTRE. CARPARKING,LAKE STREET,CAIRNS PERFORMING FEASIBILITY STUDY.
FINAL REPORT 1 500 A3,ARTS CENTRE 6th June 2013 40. SECTION 3 THROUGH FOYER AND LOADING,CONVENTION CENTRE EXISTING CAIRNS. EXPANSION CONVENTION,FOYER DOCK,CARPARKING,LAKE STREET. CAIRNS PERFORMING FEASIBILITY STUDY,FINAL REPORT 1 500 A3. ARTS CENTRE 6th June 2013 41,SECTION 4 THROUGH THEATRES.
500 SEAT BACK OF 1000 SEAT BACK OF,FLEXIBLE HOUSE AUDITORIUM HOUSE. CARPARKING,WHARF STREET HARTLEY STREET,CAIRNS PERFORMING FEASIBILITY STUDY. FINAL REPORT 1 500 A3,ARTS CENTRE 6th June 2013 42.


Related Books

2) GREC 2019 workshop (update)

2 GREC 2019 workshop update

methods. Graphics Recognition is a sub-field of document image analysis that deals with graphical entities in engineering drawings, comics, musical scores, sketches, maps, architectural plans, mathematical notation, tables, diagrams, etc. The aim of this workshop is to maintain a very high level of interaction and creative discussions

Architectural Wall Panel Range - az750602.vo.msecnd.net

Architectural Wall Panel Range az750602 vo msecnd net

JOIN WITH GUN GRADE SEALANT Dwg. Title Application Dwg. No. Rev. These construction drawings are the property of Kingspan Insulated Panels Pty. Ltd. and

The Architect, the Client and Effective Communication in ...

The Architect the Client and Effective Communication in

Computer- Mediated Communication (CMC) such as telephones, fax, email, and video conferencing. In the field of architecture, communication between the architect and his client is based on a relationship that uses everything from verbal communication to computer generated technical architectural drawings to communicate. Digital technology in

Maxwell and LeBreton Office Records - SEAA

Maxwell and LeBreton Office Records SEAA

Collection 169/Rev. 02/20/2017/KW/1 Maxwell and LeBreton Office Records SOUTHEASTERN ARCHITECTURAL ARCHIVE COLLECTION 169 Thermo-Con Residence, New Orleans, LA. Sporl and Maxwell, architects, McLaney Construction Company. 1948. Pencil on tracing paper. SCOPE and CONTENTS Project drawings 1940s - 1981 8 flat file drawers

Introduction to Drawing and Design Revised Curriculum

Introduction to Drawing and Design Revised Curriculum

Introduction to Drafting and Design is the foundational course for the Architectural Drafting and Design pathway. Emphasis is placed on safety, geometric construction, fundamentals of computer-aided drafting, and multi-view drawings. Students learn drafting techniques through the study of geometric construction at which time they are introduced ...

STATE OF CALIFORNIA @l - California Department of ...

STATE OF CALIFORNIA l California Department of

August 31, 2020. Incorporated into the Lease are Exhibits A, B and C, which describe and depict the new tenant improvements to be built in the proposed lease space (the "DGS/Caltrans tenant improvements"). Exhibit A is a set of architectural drawings prepared by Nichols with the assistance of the DGS space planner. The drawings illustrate the ...

Parex EIFS Details - External Wall Insulation

Parex EIFS Details External Wall Insulation

Parex EIFS Details CSI SECTION 07 24 00 The drawings, and any related notes, or text contained thereon are based upon typical requirements of Parex exterior insulation and ?nish systems and are published strictly as a guide for architectural and construction industry professionals to illustrate typical or general design conditions.

Section 8.0 5220S/5230S/5260X. Parts L ist 5220S/5230S ...

Section 8 0 5220S 5230S 5260X Parts L ist 5220S 5230S

19 Section 8.0 5220S/5230S/5260X. Parts L ist 5220S/5230S Exploded View Figure 8.1

5220S/5230S/5260X PARTS LIST - Binding - ADSS

5220S 5230S 5260X PARTS LIST Binding ADSS

20 Section 8.0 5220S/5230S/5260X. Parts List 5220S/5230S Exploded View Parts List Figure 8.1 QTY * Warning Label 1 * Warning Label 1

Program & Abstract Book

Program amp Abstract Book

MGED8 B ERG EN N ORW AY 8thIneraiol Mgf McyGExpsD S 1-13mb2 05 Keynotspakr: TmGig-AfxIc SuK SF MhlAb CdUv w .cbu.ino/mged8 Je nyBrian,GvShlock J sHCust QbRgm